The Marine Viaduct, connecting the RTS Link between Bukit Chagar and Woodlands North made a significant progress in the development. Crossing the Straits of Tebrau, the Marine Viaduct terrestrial bridge is 750 meters long from the shoreline of Stulang Laut. Moreover, few meters from the Malaysia-Singapore border, pier 47 will be the penultimate pier for the RTS Link Project on the Malaysian’s side and will be connected by a drop-in span with pier 48 from the Singaporean’s side. With an estimated passenger capacity of 10,000 passengers per hour per direction, the cross-border rail link will alleviate the current Causeway congestion, with the RTS Link expected to take on 30% of the existing load.Learn more about our project at www.mymrt.com.my. #RTSLink #MRTCorp #JohorBahru #Singapore